Changes
Page history
Create Maintenance Log Page
authored
May 19, 2020
by
Joris Dam
Show whitespace changes
Inline
Side-by-side
Maintenance-Log-Page.md
0 → 100644
View page @
222b3f46
This page is intended to log all regular maintenance and repair for the Stoll Knitting machine at IDE Lab
January 2020: knitting machine machine installed
February 2020: oiled the needle bed
April 2020:
May 2020:
**12-05-2020:**
air ventilation was added to at back of knitting machine, to prevent the smell of the oil from going into the lab
**19-05-2020:**
-
oiled the needle bed
-
oiled the carriage travel beams (on top)
note: there is quite some black residue (? not sure if its oily yarns dust) on the carriage travel beams. Should be removed next time
\ No newline at end of file